How much does a website cost in Australia in 2026, and what drives the difference

Vasilii Aldukhov
Two website quotes for the same brief, $800 and $8,000, side by side

Send the same brief to five Australian suppliers and you can get quotes of $800 and $8,000 back, with nothing attached that explains the gap. Nobody shows their working. So you are left comparing two numbers that describe different amounts of work, using the same words.

This guide puts the published prices side by side, gives the cost breakdown behind them, and adds the ongoing costs that quotes usually leave out. It also shows how to check a quote line by line before you sign it.

Key takeaways

  • Australian suppliers publish build prices from about $2,000 to $15,000 for a business website, with the middle around $3,000 to $8,000. The six 2026 guides compared here agree the spread comes from scope rather than skill.
  • Running costs decide the real number. A .au domain licence is AUD $9.50 a year at wholesale, and hosting often triples or worse when the introductory term ends.
  • On a three year view the cheapest build is rarely the cheapest website.
  • Two lines in any quote can be checked in under a minute: the domain and the hosting.
  • Under ATO ruling TR 2016/3, building the site is capital and most of what you pay afterwards is not.

What a website actually costs in Australia

How much does it cost to build a website in Australia? A business website from an Australian supplier generally runs between $2,000 and $15,000 to build. The spread is real, and it is mostly scope.

Six Australian pricing guides published or updated in 2026 put it like this. These are suppliers publishing their own view of the market, not independent research, so read them as positions rather than findings.

SourcePublished build rangeUpdated
PSOS$500 to $1,000 for a solo developer, agencies $3,000 to $8,000 or more15 April 2026
Grove Foundry$2,000 to $5,000 freelancer, $5,000 to $15,000 business site14 July 2026
GoDaddy Australia$2,500 to $10,000 for a designer built brochure site1 May 2026
Wolf IQ$3,000 to $7,000 brochure, $5,000 to $25,000 or more ecommerceJune 2026
SB Web Designs$3,000 to $10,000, own packages from $3,500 plus GST2026
Rocking Web$5,000 to $10,000 for a professional 5 to 10 page custom build8 June 2026
Published build price ranges from six Australian guides Floating bars showing the low and high published build price for each of six Australian suppliers, ranging from $500 to $15,000. Published build price ranges, AUD, six Australian guides, retrieved 5 August 2026 PSOSGrove Foundry GoDaddy AUWolf IQ SB Web DesignsRocking Web $500 to $1k$2k to $15k $2.5k to $10k$3k to $7k $3k to $10k$5k to $10k $0$5,000 $10,000$15,000 Source: published pricing pages of the six suppliers listed above
Published build price ranges from six Australian suppliers, retrieved 5 August 2026.

One thing worth correcting while you read guides like these. Several of them overstate how much of the web runs on WordPress. W3Techs tracks it continuously. On 27 August 2026 WordPress ran 40.7 per cent of all websites, and 58.9 per cent of sites with a known content management system. Large numbers, but not the 68 per cent you will sometimes see quoted.

That matters for a pricing decision in one practical way. WordPress is common enough that you can change supplier without rebuilding. Over five years that is worth more than any single quote you are comparing today.

The four paths, and what each one really includes

What it costs to build a website tracks who does the work you never see. Structure, content, testing, setup and handover take the hours, and design takes fewer of them than most people expect.

Do it yourself. A website builder subscription and your own time. DIY website builders like Wix, Squarespace and the GoDaddy website builder are the cheapest way in. GoDaddy Australia lists its builder at $14.95 to $22.69 a month on an annual plan. There is no build fee, because you are the builder.

A solo developer. PSOS publishes $500 to $1,000 and includes design, copywriting, search setup, analytics, forms, a training video and twelve months of hosting. That is a genuine offer at the bottom of the market, and it works when the scope is small and fixed.

A small studio. Roughly $2,000 to $5,000 for a small business website. You get a named person who plans the page structure before designing anything, and who is still there after launch. That is the band we build in. If you want to see what changes between the price steps, our three website design packages are published with what each one includes.

A web design agency. Grove Foundry puts agency work at $10,000 and up, with blended rates of $100 to $200 an hour. You are buying capacity and process, including account management. Larger web design agencies price capacity rather than design work, and they put several website designers on one project.

None of these tiers is wrong. Mismatch is what costs money. A sole operator buying a $200 template is making a sensible decision, and a business with eight service lines buying the same template is not.

Australian forum threads have carried the same ladder for years. Whirlpool regulars split it as roughly $2,000 for development only, about $3,000 for a freelancer doing both design and development, and $10,000 and up once an agency is involved, with agency overhead named as the difference. That thread is from 2012, so treat the shape as durable and the numbers as indicative. The ladder has held for fourteen years.

Where the hours actually go

Design is the visible part and rarely the expensive one. On a ten page business website the hours usually land like this. It explains why website development costs sit above design costs on most quotes.

  • Structure and planning. Deciding what pages exist, what each one is for, and how someone moves from landing on the site to making contact. Get this wrong and no amount of design repairs it.
  • Content. Writing or rewriting the service pages. This is the single most common reason projects run late, because most businesses underestimate how long their own words take.
  • Build and integration. Templates, forms, bookings, payments and whatever tools the business already runs on.
  • Testing and handover. Mobile and browser checks, form testing, speed checks, then showing someone how to edit their own site.

A quote that names hours against those four items can be compared with another quote. A quote that says “5 page website, $2,500” cannot, because you have no idea which of the four it covers.

What you pay every year after launch

Website maintenance is the line most quotes leave out. Budget 10 to 15 per cent of the build cost every year for upkeep. That is Grove Foundry’s guideline, and it is close to what we see in practice. Three items make up most of it.

The domain. The wholesale price of a .au domain licence is AUD $9.50 a year including GST, set by auDA from 1 October 2025. Retail sits above that, and registrars publish their own margin: GoDaddy Australia lists .com.au from $20 to $50 a year. Anything far above that is markup, not cost.

Hosting, which quietly reprices. This is the line that grows without anyone doing anything. On SiteGround Australia the entry StartUp plan is $4.99 a month promotional, prepaid for twelve months, and $26.99 a month on renewal. That is 5.4 times the first year rate. GrowBig runs $7.49 then $39.99, and GoGeek $12.49 then $64.99. SiteGround publishes those rates excluding GST, so add ten per cent if you cannot claim it back. Australian host VentraIP is gentler: WordPress hosting at $9.25 promotional against $18.50 standard.

Plugins and maintenance. Grove Foundry puts five paid plugin licences at $300 to $500 a year, which matches what a typical business site needs. Care plans are the bigger decision, and they are billed as a monthly fee. SB Web Designs publishes maintenance from $159 a month, GoDaddy quotes a market range of $90 to $2,000 or more a month, and Grove Foundry puts agency maintenance at $100 to $500 a month.

Where the annual running cost of a maintained business website goes Donut chart of a $2,552 annual running cost: care plan $1,908, hosting $324, plugins $300, domain $20. Annual running cost of a maintained business website, worked example, AUD $2,552 per year Care plan, $1,908 at $159 a month Hosting on renewal, $324 Paid plugins, about $300 Domain licence, about $20 Hosting from SiteGround AU renewal rate, care plan from SB Web Designs published price, domain from auDA wholesale plus registrar margin. Retrieved 5 August 2026.
A worked example of annual running costs once someone else maintains the site.

Those are the additional costs to consider before you compare two build prices. None of these three sit inside a build price. We list them under what is not included, so the yearly figure is visible before you sign anything.

Drop the care plan and do the updates yourself and the same site runs at roughly $644 a year. That is the real choice behind maintenance pricing: what you pay for a website after launch buys someone else’s attention, not software.

Three years, not one

Compare the total cost of a website over three years, not the build price. On that view the cheapest start often finishes last, and the gaps between paths are smaller than the quotes suggest.

Cumulative cost of four ways to run a business website over 36 months Line chart of cumulative spend. Do it yourself reaches about $817, a small studio build about $3,932, a freelancer build about $5,432, and an agency build with a care plan about $17,656. Cumulative cost over 36 months, AUD, worked example $0$9k$18k launch12 months 24 months36 months DIY $817 Studio $3,932 Freelancer $5,432 Agency $17,656 Assumes builds of $0, $2,000, $3,500 and $10,000, self managed upkeep of $644 a year for the middle two paths, and a $159 a month care plan on the agency build. Method stated in full below.
Three year cost of ownership by path, using published Australian rates.

The method is open, so you can disagree with it. Builds are set at $0, $2,000, $3,500 and $10,000, near the middle of the published ranges above. Upkeep is $644 a year where you maintain the site yourself, using the SiteGround renewal rate, about $300 of plugin licences and a $20 domain. That hosting rate is published excluding GST. Add it and upkeep is closer to $676. The agency line adds a $159 a month care plan. The do it yourself line uses a $22.69 monthly builder plan and no build fee.

What the model leaves out matters as much as what it counts. It excludes your own hours, content and photography, and paid advertising. It also excludes the largest hidden cost of all, which is rebuilding early because the first site could not carry a second service line.

Two things change the ranking quickly. Drop the care plan from the agency line and it falls by roughly $5,700 over three years. Add one rebuild to the do it yourself line, because the builder could not grow with the business, and the cheapest path stops being cheap.

How to read a quote line by line

Trust usually breaks on one line, not on the total. Two of them take under a minute to check.

The domain. Against the $9.50 wholesale above, a line reading $200 for domain registration is not a cost. It tells you how the rest of the quote was built.

Hosting. Ask which host and which plan, then open that host’s pricing page. If the quote uses the promotional rate, your second year is already more expensive than you were told.

Four more questions worth asking any supplier, including us:

  1. What exactly does “SEO included” cover? Page titles and a sitemap are setup, not a search campaign.
  2. Who owns the domain, the hosting account and the files after launch, and in whose name are they registered?
  3. What happens if I stop paying next month? If the answer is that everything keeps running, the fee buys service. If a login stops working, it bought access.
  4. How many review rounds are included, and what does an extra one cost?

We answer the second one on the packages page: you own the domain, hosting and files from day one.

Three more lines are worth a second look, because they are where scope quietly leaves the quote.

“SEO included”. Setup and search work are different products. Clean page titles, a sitemap and Search Console access are setup, and they should be part of any build. Keyword research, content and ongoing work are a separate service with a separate price.

Content. Check whether the quote assumes you supply the website content. Most do. If yours does and you have eight service pages to write, that is the part of the website project most likely to run late.

Migration. If you have an existing site with traffic, ask what happens to the old addresses when the new website goes live. Redirects and a check of what currently ranks are cheap during the build and expensive afterwards.

A supplier who asks you several questions before quoting is usually the one who has understood the job. Jumping straight to a number means the number came from somewhere other than your business.

Are website costs tax deductible in Australia?

Partly, and the split is set by ATO taxation ruling TR 2016/3, which deals specifically with expenditure on a commercial website. We build websites and we do not give tax advice. Treat this as a map for the conversation with your accountant, not as the advice itself.

What you spend onCharacterParagraph
Acquiring or developing the siteCapital, then treated as in-house software18
Periodic hosting, registration and licence feesRevenue, deductible over the period they relate to17
Domain registration, including the first oneRevenue, deductible when paid, unless the period is over 13 months53
A one off payment to secure a domain nameCapital, and part of the cost base of a CGT asset54 and 55
Maintenance, including fixing faultsRevenue20 and 21
Small additions to existing functionalityRevenue23
Significant new functionalityCapital23 and 27
Updates so pages display correctly on new browsers and devicesUsually revenue29
Migrating content to a new siteCapital, as part of building the new site35

Two practical notes. The ruling treats a website as not being a depreciating asset except where it counts as in-house software, at paragraph 40. And an article that still cites TR 2001/6 is out of date, because that earlier ruling has been withdrawn.

What we charge, and why it sits where it does

We publish our prices, because comparing quotes without numbers wastes everyone’s time.

A WordPress build at Web Ways Tech runs from $1,200 for a five-page small business website to $3,400 for a larger one. The middle package, up to ten pages, is $2,000. All three are fixed prices in AUD. They are final, and no GST is added. Search setup is $1,300 once, added at build time. Ongoing search work is $790 a month. Most businesses take the build plus search setup, because a site nobody finds is an expensive brochure.

That sits below the Australian middle of roughly $3,000 to $8,000, and the reason is structural rather than a discount. There is no city office to fund. There is no account management layer between you and the person building the site. The stack is one we have used for years, not one chosen fresh each project. Quality is where we compete. Overhead is where we cut.

Numbers are easy to publish and harder to stand behind. Our case studies show what each scope actually turned into.

It also means we are not the right call for every job. If you need a team of six, a brand strategy and a campaign to launch it, an agency will serve you better. It will also charge accordingly.

If your current site is the problem rather than the absence of one, the website redesign route is usually cheaper than a full rebuild.

Compare that against the full table on our WordPress website design services page.

How to decide what to spend

Most small business owners start from page count. Start from what the site has to do instead. The cost depends on the type of website and on your business goals more than on the number of pages.

A brochure website. One service, one area, no plans to expand. A builder subscription or a small fixed scope build is the sensible buy. Spending more here will not return more, and a $10,000 site for a one trade operator is money that would do more work as advertising.

A small business website that collects enquiries. Several services that each need their own page, a clear contact path, and search foundations built in from the start. This is where a studio build earns its price, because structure decides whether the pages can rank at all. Expect the middle of the market, roughly $3,000 to $8,000, and expect content to be the part that takes your time.

An ecommerce website. Products, payments, shipping and a checkout that does not lose people halfway. Costs rise with the catalogue and the integrations rather than with the design. Grove Foundry puts a basic store at $8,000 to $20,000 and GoDaddy at $8,500 to $20,000 or more, and both climb once stock, delivery rules and accounting need to talk to each other. If that is you, start from scope rather than price: our ecommerce website development page lists what drives the number.

Running a trade business. Costs sit at the lower end, because the job is usually lead generation rather than content. What decides the price is how many services need their own page. Count your services first, then read what that means for price on our websites for tradies page.

A custom website. Once the site needs custom design and custom development rather than a template, pricing leaves the package ladder. At the small studio end custom builds start from about $5,500, and the figure moves with integrations and content volume rather than with page count. If that is your situation, scope it before comparing prices: custom web design and development sets out what we look at first.

If the website budget is tight, spend it in this order: structure, content, speed, then visuals. A plain site with clear service pages outperforms a beautiful one that nobody can navigate.

One more test before you commit. Ask what happens in year three, when you add a service, change supplier or want to move the site. If the honest answer is that you would start again, the quote is cheaper than it looks today and dearer than it looks over time.

Questions we get asked

How much does a website cost for a small business in Australia?

Most published Australian ranges fall between $2,000 and $15,000, and a professional website usually costs between $3,000 and $8,000 once someone else does the structure, content and testing. Take the midpoint of each of the six ranges above and the mean is about $6,800. Those ranges describe different products, so read it as a centre of gravity rather than a price.

How long does it take to build a website?

One to six weeks for a small business website, and content is usually what decides where in that range you land. A supplier who cannot answer this has not scoped the job.

Why is one quote $800 and another $8,000 for the same brief?

Ask what each quote includes for structure, content, testing and handover. The gap is almost always scope rather than skill, and the wording on the page hides it.

What does it cost to keep a website running for a year?

About $644 at published rates if you maintain it yourself, or about $676 once GST is added to the hosting line. Add a care plan and it runs closer to $2,500.

How much should a .com.au domain cost?

The wholesale licence is $9.50 a year including GST from auDA. Retail of $10 to $50 is normal, and anything much higher is margin.

Can I claim my website as a tax deduction?

Some of it, and not all at once. Building the site is capital under TR 2016/3, while hosting, domain renewals and maintenance are generally revenue. Confirm your own position with your accountant.

If you are weighing up quotes and want a second read on them, that is a conversation we are happy to have. It does not depend on you building with us. Talk through your website needs.

Vasilii Aldukhov founded Web Ways Tech in Sydney and has built websites for ten years, mostly in WordPress. He works with Australian businesses on rebuilds, ecommerce and the search foundations underneath them.

On this page

No cost

See your homepage before you pay for it

We design the first screen of your website free, in two business days. One concept per business, no obligation.

Vasilii Aldukhov

Founder and developer, Web Ways Tech

Vasilii Aldukhov founded Web Ways Tech in Sydney and has built websites for ten years, mostly in WordPress. He works with Australian businesses on rebuilds, ecommerce and the search foundations underneath them.

Share this article LinkedIn Facebook X Email

Keep reading

More on building and fixing websites in Australia.

A browser window with its bottom strip in blue, labelled Phone, Privacy, Licence no. and ABN, beside the words 30 footers checked
Website Design & Development

Website Footer: What an Australian Business Site Has to Carry, and What 30 Local Sites Actually Show

Five boxes in a chain, the first filled blue, with the words ABN first, then the domain, then the money
Website Design & Development

How to Start an Online Store in Australia: ABN, GST, Platform and Payments

Ring of seven numbered segments with segment six highlighted, beside the words seven quality areas, 40 elements, 10 a parent can see
Website Design & Development

The seven Quality Areas, translated into what a parent sees on your website

Want this done on your site?

Web Ways Tech builds and rebuilds websites for Australian businesses, from Kogarah in Sydney. Tell us what you have now and what is not working.